Tema de Viquiprojecte Discussió:Trobada d'Estratègia 2019/Difusió/Capacity 6

TaronjaSatsuma (discussiócontribucions)

How do you measure the contribution to the infraestructure of the ecosystem?

Metrics are needed, but demanding metrics about everything is sometimes useless. What happens if two affiliates choose different criteria about Capacity Building? (ex. number of projects vs. number of volunteers engaged).

We have experience of doing reports that were considered too much long. This recomendation proposes more metrics. Who is going to read them?

We have a lot of doubts.

Resposta a «Evaluating»